Additional time which a non-critical activity can consume without increasing the project duration is called ______________.

Additional time which a non-critical activity can consume without increasing the project duration is called ______________.

Additional time which a non-critical activity can consume without increasing the project duration is called ______________.

 Options:

A. Total Float.
B. Free Float
C. Independent Float.
D. Dependent Float

The Correct Answer Is:

  • A. Total Float.