The gross material requirements plan combines
Options:
A. It shows total demand for an item. B. It shows when an item must be ordered from a supplier or when production must be started. C. It combines a master production schedule with the time-phased schedule. D. It requires several inputs, including an accurate bill of material. E. All of the above. |
The Correct Answer Is:
E. All of the above.